Project members:
•DR Strong was the civil engineering firm for the entirety of the project
•David Jensen was the septic engineer for the entirety of the project
•Taylor Developments
(Land Developer Bellevue WA) purchased the project after preliminary plat approval but before construction and permitting
•Taylor Developments provided funding to RM Homes for construction
•Taylor Developments is currently managing/funding the failed LOSS system on behalf of the HOA
LOSS SEPTIC SYSTEM (malfunctioning)
(Designed and Engineered by David Jensen PE)
•Averaging 60 mg/L nitrates (600% higher than target)
•Testified by David Jensen at Cedar23 hearing
•Unknown if this is entering groundwater